The SPES project at the INFN- Laboratori Nazionali di Legnaro

The SPES Radioactive Ion Beam (RIB) facility at INFN-LNL is in the construction phase. It is based on the ISOL method with an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is delivered by a high current Cyclotron accelerator, with energy 35-70 MeV and a beam current of...

Full description

Bibliographic Details
Main Authors: Pretea G., Andrighetto A., Manzolaro M., Corradetti S., Scarpa D., Rossignoli M., Monetti A., Lollo M., Calderolla M., Vasquez J., Zafiropoulos D., Sarchiapone L., Benini D., Favaron P., Rigato M., Pegoraro R., Maniero D., Calabretta L., Comunian M., Maggiore M., Lombardi A., Piazza L., Porcellato A.M., Roncolato C., Bisoffi G., Pisent A., Galatà A., Giacchini M., Bassato G., Canella S., Gramegna F., Valiente J., Bermudez J., Mastinu P.F., Esposito J., Wyss J., Zanella S.
Format: Article
Language:English
Published: EDP Sciences 2014-03-01
Series:EPJ Web of Conferences
Online Access:http://dx.doi.org/10.1051/epjconf/20146611030