The SPES project at the INFN- Laboratori Nazionali di Legnaro
The SPES Radioactive Ion Beam (RIB) facility at INFN-LNL is in the construction phase. It is based on the ISOL method with an UCx Direct Target able to sustain a power of 10 kW. The primary proton beam is delivered by a high current Cyclotron accelerator, with energy 35-70 MeV and a beam current of...
Main Authors: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2014-03-01
|
Series: | EPJ Web of Conferences |
Online Access: | http://dx.doi.org/10.1051/epjconf/20146611030 |