Evaluation of long-term operation of combined system for heating the building and preparation of domestic hot water
The paper presents, the results of research on the operation and energy efficiency of a 186 kW gas-fired condensing boiler operating in a hybrid heat source system. The boiler co-operates with an 81.1 kW (electric) brine-to-water compressor heat pump, a 27.4 kW air-to-water heat pump and 6 flat sola...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20184600018 |