Underground travel time estimation for macro simulation models, on the example of the first line in Warsaw
In this paper, the author’s model of underground travel time prediction was presented. The structure of the model can be used to estimate the travel time of any underground line in the planning phase. The model takes into account the length and the variability of running time between stations and st...
Main Author: | Marek Bauer |
---|---|
Format: | Article |
Language: | English |
Published: |
Lublin University of Technology
2014-12-01
|
Series: | Budownictwo i Architektura |
Subjects: | |
Online Access: | https://ph.pollub.pl/index.php/bia/article/view/1707 |
Similar Items
-
Estimating Freeway Travel Time Reliability for Traffic Operations and Planning
by: Yang, Shu, et al.
Published: (2016) -
Suitability Evaluation of a Train’s Scheduled Section Travel Time
by: Maosheng Li, et al.
Published: (2020-03-01) -
How accurate is the regional travel demand model in mimicking real-world travel times?
by: Srinivas S. Pulugurtha, et al.
Published: (2019-01-01) -
Simulation of Truck Haulage Operations in an Underground Mine Using Big Data from an ICT-Based Mine Safety Management System
by: Jieun Baek, et al.
Published: (2019-06-01) -
Selection and application of the touchable elements for blind and people in the Warsaw underground
by: Janusz Poliński, et al.
Published: (2013-12-01)