Underground travel time estimation for macro simulation models, on the example of the first line in Warsaw
In this paper, the author’s model of underground travel time prediction was presented. The structure of the model can be used to estimate the travel time of any underground line in the planning phase. The model takes into account the length and the variability of running time between stations and st...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Lublin University of Technology
2014-12-01
|
Series: | Budownictwo i Architektura |
Subjects: | |
Online Access: | https://ph.pollub.pl/index.php/bia/article/view/1707 |