Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project

To realize demand-oriented operations in the middle route of South-to-North Water Diversion Project, this paper proposed a pool operation method that a variation interval of water level at the upstream of the check gate is allowed. In this method, water users’ demand for flow changes can be satisfie...

Full description

Bibliographic Details
Main Authors: Wu Yongyan, Huang Huiyong, Li Qi, Yan Yibo
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201824601039

Similar Items