Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
To realize demand-oriented operations in the middle route of South-to-North Water Diversion Project, this paper proposed a pool operation method that a variation interval of water level at the upstream of the check gate is allowed. In this method, water users’ demand for flow changes can be satisfie...
Main Authors: | Wu Yongyan, Huang Huiyong, Li Qi, Yan Yibo |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201824601039 |
Similar Items
-
Impact on operation of the Middle Route Project of South-to-North Water Diversion
by: Wan Hui, et al.
Published: (2018-01-01) -
Real-Time Control of the Middle Route of South-to-North Water Diversion Project
by: Yongyan Wu, et al.
Published: (2021-01-01) -
Simulation and Analysis of Accident Condition and Coping Operations of The Dian Zhong Water Diversion Project
by: Yan Yibo, et al.
Published: (2018-01-01) -
Emergency Operation Technologies for Sudden Water Pollution Accidents in the Middle Route of South-to-North Water Diversion Project
Published: (2018) -
Spatio-Temporal Variation of Total Nitrogen and Ammonia Nitrogen in the Water Source of the Middle Route of the South-To-North Water Diversion Project
by: Dong Guoquan, et al.
Published: (2020-09-01)