Operation method of allowing variation interval of downstream water level in the middle route of South-to-North Water Diversion Project
To realize demand-oriented operations in the middle route of South-to-North Water Diversion Project, this paper proposed a pool operation method that a variation interval of water level at the upstream of the check gate is allowed. In this method, water users’ demand for flow changes can be satisfie...