Automated Optimization for the Production Scheduling of Prefabricated Elements Based on the Genetic Algorithm and IFC Object Segmentation

Background: With the ever-increasing availability of data and a higher level of automation and simulation, production scheduling in the factory for prefabrication can no longer be seen as an autonomous solution. Concepts such as building information modelling (BIM), graphic techniques, databases, an...

Full description

Bibliographic Details
Main Authors: Zhao Xu, Xiang Wang, Zezhi Rao
Format: Article
Language:English
Published: MDPI AG 2020-12-01
Series:Processes
Subjects:
Online Access:https://www.mdpi.com/2227-9717/8/12/1593