Methodology for Assessment the Possibility of Transfer Six-Phase Power Line into the Mode of Operation with Incomplete Number of Phases

In electric power systems due to various reasons: short circuits, phase breaks, ice melting, phase-by-stage repair of a high-voltage power line (transmission line), interruptions in the power sup-ply to the consumer occur. On single-sided power lines, this leads to a prolonged shutdown of consumers,...

Full description

Bibliographic Details
Main Authors: Kiorsak M.V., Turturica N.N.
Format: Article
Language:English
Published: Academy of Sciences of Moldova 2020-03-01
Series:Problems of the Regional Energetics
Subjects:
Online Access:http://journal.ie.asm.md/assets/files/05_01_45_2020.pdf