Hybrid Estimation of Distribution Algorithm for Solving Three-Stage Multiobjective Integrated Scheduling Problem

Aiming at reducing the total energy consumption of three stages processing-transportation-assembly in the assembly manufacturing industry, a three-stage multiobjective integrated scheduling problem with job batch transportation considering the energy consumption (3sMISP_JBTEC) is proposed, and a com...

Full description

Bibliographic Details
Main Authors: Chao Deng, Rong Hu, Bin Qian, Huai P. Jin
Format: Article
Language:English
Published: Hindawi-Wiley 2021-01-01
Series:Complexity
Online Access:http://dx.doi.org/10.1155/2021/5558949