Analysis of the number of switches of on-load tap changer of a power transformer for field substation, taking into account discrete time and voltage level sampling

The introduction of “smart grids” technologies poses the problems of multi-criteria determination of the optimum voltage in the main substation of the object under study. In this study the busbar sections of the field substation of the oil and gas company is considered as the main substation. This p...

Full description

Bibliographic Details
Main Authors: Tabachnikova T.V., Shvetskova L.V., Yumalin A.V.
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/80/e3sconf_ses2020_01056.pdf