A New Imperialist Competitive Algorithm for Multiobjective Low Carbon Parallel Machines Scheduling
This paper considers low carbon parallel machines scheduling problem (PMSP), in which total tardiness is regarded as key objective and total energy consumption is a non-key one. A lexicographical method is used to compare solutions and a novel imperialist competitive algorithm (ICA) is presented, in...
Main Authors: | Zixiao Pan, Deming Lei, Qingyong Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2018-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2018/5914360 |
Similar Items
-
An Imperialist Competitive Algorithm With the Diversified Operators for Many-Objective Scheduling in Flexible Job Shop
by: Ming Li, et al.
Published: (2019-01-01) -
An imperialist competitive algorithm for a bi-objective parallel machine scheduling problem with load balancing consideration
by: Mansooreh Madani-Isfahani, et al.
Published: (2013-04-01) -
A Novel Imperialist Competitive Algorithm With Multi-Elite Individuals Guidance for Multi-Object Unrelated Parallel Machine Scheduling Problem
by: Mei Wang, et al.
Published: (2019-01-01) -
Multi-Objective Energy-Efficient Interval Scheduling in Hybrid Flow Shop Using Imperialist Competitive Algorithm
by: Rui Zhou, et al.
Published: (2019-01-01) -
An Imperialist Competitive Algorithm Incorporating Remaining Cycle Time Prediction for Photolithography Machines Scheduling
by: Peng Zhang, et al.
Published: (2018-01-01)