A New Imperialist Competitive Algorithm for Multiobjective Low Carbon Parallel Machines Scheduling
This paper considers low carbon parallel machines scheduling problem (PMSP), in which total tardiness is regarded as key objective and total energy consumption is a non-key one. A lexicographical method is used to compare solutions and a novel imperialist competitive algorithm (ICA) is presented, in...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2018-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2018/5914360 |