Construction and assembly works planning: optimization or search for solutions
The article analyzes the instability causes of construction and assembly works (CAW) schedules which leads to the construction works and logistics instability. The “nature” of multi-variant management solutions is considered. The contradiction of requirements to the basic organizational and technolo...