Treatment of Olive Mill Wastewater with Constructed Wetlands

The objective of this study was to investigate the application of constructed wetlands as a mean to manage olive mill wastewater (OMW). Two free water surface (FWS) constructed wetlands, one without (CW1) and one with effluent recirculation (CW2), were operated for a two-year period with diluted OMW...

Full description

Bibliographic Details
Main Authors: Andreas N. Angelakis, Iosif E. Kapellakis, Nikolaos V. Paranychianakis, Konstantinos P. Tsagarakis
Format: Article
Language:English
Published: MDPI AG 2012-03-01
Series:Water
Subjects:
Online Access:http://www.mdpi.com/2073-4441/4/1/260/