Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China

In this study, the reasonable construction sequence of an overlapping tunnel shield is investigated. Taking the overlapping tunnel of Tianjin Metro Line 5 as the background, a three-dimensional numerical model was established using Flac3D software to study the influence of the “first up and then dow...

Full description

Bibliographic Details
Main Authors: Zhiyong Yang, Yaowen Ding, Yusheng Jiang, Kuanda Fang, Linwei Dong, Weiqiang Qi, Zheng Wei
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/4909750