THE APPLICATION OF A STOCKPILE STOCHASTIC MODEL INTO LONG-TERM OPEN PIT MINE PRODUCTION SCHEDULING TO IMPROVE THE FEED GRADE FOR THE PROCESSING PLANT
This paper presents a chance-constrained integer programming approach based on the linear method to solve the longterm open pit mine production scheduling problem. Specifically, a single stockpile has been addressed for storing excess low-grade material based on the availability of processing capaci...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mining, Geology and Petroleum Engineering
2020-01-01
|
Series: | Rudarsko-geološko-naftni Zbornik |
Subjects: | |
Online Access: | https://hrcak.srce.hr/file/357440 |