An Exact Method and Ant Colony Optimization for Single Machine Scheduling Problem With Time Window Periodic Maintenance

This paper considers a time window periodic maintenance strategy with different duration windows and job scheduling activities in a single machine environment. The aim is to minimize the number of tardy jobs through the integration of production scheduling and periodic maintenance intervals. A mixed...

Full description

Bibliographic Details
Main Authors: Ammar A. Qamhan, Aref Ahmed, Ibrahim M. Al-Harkan, Ahmed Badwelan, Ali M. Al-Samhan, Lotfi Hidri
Format: Article
Language:English
Published: IEEE 2020-01-01
Series:IEEE Access
Subjects:
Online Access:https://ieeexplore.ieee.org/document/9018227/