Two-Agent Single-Machine Scheduling with Resource-Dependent Starting Times

We consider several two-agent scheduling problems with resource consumption on a single machine, where each of the agents wants to minimize a measure dependent on its own jobs. The starting time of each job of the first agent is related to the amount of resource consumed. The objective is to minimiz...

Full description

Bibliographic Details
Main Authors: Peng Liu, Xiaoyu Tian
Format: Article
Language:English
Published: Hindawi Limited 2013-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2013/805261