Bridge Responses Induced by Adjacent Subway Station Construction Using Shallow Tunneling Method
This paper presents a case of subway station construction under an existing prestressed concrete bridge with a three-span continuous beam located at the intersection of the 3rd Ring Road, Beijing. The Huayuan Subway Station of line 6, constructed crossing between #7 and the #8 piers of the bridge by...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2018-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2018/8918749 |