Bridge Responses Induced by Adjacent Subway Station Construction Using Shallow Tunneling Method

This paper presents a case of subway station construction under an existing prestressed concrete bridge with a three-span continuous beam located at the intersection of the 3rd Ring Road, Beijing. The Huayuan Subway Station of line 6, constructed crossing between #7 and the #8 piers of the bridge by...

Full description

Bibliographic Details
Main Authors: Jie Su, Qian Fang, Dingli Zhang, Xiaokai Niu, Xiang Liu, Yunming Jie
Format: Article
Language:English
Published: Hindawi Limited 2018-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2018/8918749