INTEGER PROGRAMMING DENGAN PENDEKATAN METODE BRANCH AND BOUND

The purpose of this study was to determine the allocation of projects to be implemented by the Department of Road Infrastructure Pripinsi West Sumatra in 2005, so the cost minimum. The method used is the method of Branch And Bound together with the simplex method with a solution in the form of binar...

Full description

Bibliographic Details
Main Author: NOLA NARI
Format: Article
Language:Indonesian
Published: Institut Agama Islam Negeri (IAIN) Batusangkar 2016-09-01
Series:Sainstek: Jurnal Sains dan Teknologi
Online Access:http://ecampus.iainbatusangkar.ac.id/ojs/index.php/sainstek/article/view/82