Modelling of Existing Heating Plant Replacement with a Waste to Energy Plant and a Peak-Load Natural Gas Boiler
The paper assesses the possibility of replacement of a heating plant with a waste-to-energy (WtE) plant as base heat source, together with a natural gas boiler for covering power peaks and as thermal backup. The decision of the Commission of the EU Member States of July 2017 shows a tightening of th...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
AIDIC Servizi S.r.l.
2018-08-01
|
Series: | Chemical Engineering Transactions |
Online Access: | https://www.cetjournal.it/index.php/cet/article/view/700 |