Estimation of damage risks for the weld assembly between the header and the steam generator nozzle in a WWER NPP
Tasks involved in determination of the NPP equipment failure risks in the process of long-term operation are of extreme importance nowadays, specifically as the NPP units in the Russian Federation are nearing the end of their design lifetimes (25–30 years) and the life of newly built NPPs is increas...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
National Research Nuclear University (MEPhI)
2017-03-01
|
Series: | Nuclear Energy and Technology |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2452303817300079 |