Method of coordinating joint operation of air starter and auxiliary power unit and determining the gas turbine engine starting time

The article describes the method developed by the authors to coordinate the working process of the auxiliary power plant (APP) and the starter air turbine (SAT) used for starting a gas turbine engine (GTD). This method is used to test the possibility of joint operation of the APP and the air turbine...

Full description

Bibliographic Details
Main Authors: G. M. Popov, O. V. Baturin, Yu. D. Novikova, V. M. Zubanov, A. A. Volkov, A. I. Korneeva
Format: Article
Language:English
Published: Samara National Research University 2020-12-01
Series:Вестник Самарского университета: Аэрокосмическая техника, технологии и машиностроение
Subjects:
Online Access:https://journals.ssau.ru/vestnik/article/viewFile/8262/7943