Alternative Mathematical Models and Solution Approaches for Lot-Sizing and Scheduling Problems in the Brewery Industry: Analyzing Two Different Situations
This research proposes new approaches to deal with the production planning and scheduling problem in brewery facilities. Two real situations found in factories are addressed, which differ by considering (or not) the setup operations in tanks that provide liquid for bottling lines. Depending on the t...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2017-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2017/6754970 |