THE VERIFICATION CALCULUS OF THE DRIVING WHEEL OF THE EXTRACTION MACHINE AT THE OLD PIT WITH A SKIP – LONEA MINING PLANT
Extracting coal from the underground and sterile from Mining Plant Lonea is made by using the extraction installation with a skip, which includes an extraction machine located in the tower of the old pit, having two skips of 8 tons each. Any malfunction of the extraction machine can lead to impor...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Academica Brancusi
2019-05-01
|
Series: | Fiabilitate şi Durabilitate |
Subjects: | |
Online Access: | http://www.utgjiu.ro/rev_mec/mecanica/pdf/2019-01/21_R%C4%83zvan%20Bogdan%20ITU,%20Iosif%20DUMITRESCU%20-%20THE%20VERIFICATION%20CALCULUS%20OF%20THE%20DRIVING%20WHEEL%20OF%20THE%20EXTRACTION%20MACHINE%20AT%20THE%20OLD%20PIT%20WITH%20A%20SKIP%20%E2%80%93%20LONEA%20MINING%20PLANT.pdf |