The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
This paper presents the synchronized and integrated two-level lot sizing and scheduling problem (SITLSP). This problem is found in beverage production, foundry, glass industry, and electrofused grains, where the production processes have usually two interdependent levels with sequence-dependent setu...
Main Authors: | Claudio F. M. Toledo, Alf Kimms, Paulo M. França, Reinaldo Morabito |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2015/182781 |
Similar Items
-
Datasets for lot sizing and scheduling problems in the fruit-based beverage production process
by: Juan Piñeros, et al.
Published: (2021-04-01) -
Alternative Mathematical Models and Solution Approaches for Lot-Sizing and Scheduling Problems in the Brewery Industry: Analyzing Two Different Situations
by: Tamara A. Baldo, et al.
Published: (2017-01-01) -
Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes
by: Claudio F. M. Toledo, et al.
Published: (2007-04-01) -
Modeling of multi-level capacitated lot-size scheduling problem
by: Ismail, Zuhaimy, et al.
Published: (2011) -
Two parameter-tuned metaheuristic algorithms for the multi-level lot sizing and scheduling problem
by: S.M.T. Fatemi Ghomi, et al.
Published: (2012-10-01)