The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
This paper presents the synchronized and integrated two-level lot sizing and scheduling problem (SITLSP). This problem is found in beverage production, foundry, glass industry, and electrofused grains, where the production processes have usually two interdependent levels with sequence-dependent setu...