A fuzzy modeling for single machine scheduling problem with deteriorating jobs
This paper addresses a bi-criteria scheduling problem with deteriorating jobs on a single machine. We develop a model for a single machine bi-criteria scheduling problem (SMBSP) with the aim of minimizing total tardiness and work in process (WIP) costs. WIP cost increases as a job passes through a s...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2010-06-01
|
Series: | International Journal of Industrial Engineering Computations |
Subjects: | |
Online Access: | http://growingscience.com/ijiec/VOL1/IJIEC_2010_16.pdf |