Control of Rock Block Fragmentation Based on the Optimization of Shaft Blasting Parameters

In the construction of shaft, the blockage of the mucking shaft may cause the mud-water inrush disaster. Oversized rock fragmentation is the main cause for the blockage of the mucking shaft in the raise boring machine (RBM) construction method. The influence degree of blasting parameters on rock fra...

Full description

Bibliographic Details
Main Authors: Qingxiang Li, Zhanyou Luo, Man Huang, Jiangbo Pan, Guoshu Wang, Yunxin Cheng
Format: Article
Language:English
Published: Hindawi-Wiley 2020-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2020/6687685

Similar Items