Control of Rock Block Fragmentation Based on the Optimization of Shaft Blasting Parameters
In the construction of shaft, the blockage of the mucking shaft may cause the mud-water inrush disaster. Oversized rock fragmentation is the main cause for the blockage of the mucking shaft in the raise boring machine (RBM) construction method. The influence degree of blasting parameters on rock fra...