Numerical Simulation Research of Smooth Wall Blasting Using the Timing Sequence Control Method under Different Primary Blast Hole Shapes
To make sure the integrity and stability of surrounding rock structure during blasting excavation of important structural planes in deep underground caverns, two kinds of fine blasting methods, timing sequence control fracture blasting network and notch blast hole, are innovatively combined and the...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2019-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2019/2425904 |