FORMATION OF PLAN COST OF READY PRODUCTS OF STEEL PRODUCTION RUP «BMZ» BY MEANS OF MODULE CONTROLLING OF SYSTEM SAP R/3

It is shown that formation of the planned cost price of finished goods of steel production of RUP«BMZ»by mean of the module of controlling system SAPR/3 – one of the most effective administrative tools at the current stage of market relations.

Bibliographic Details
Main Author: S. N. Astratov
Format: Article
Language:English
Published: Belarusian National Technical University 2011-09-01
Series:Litʹë i Metallurgiâ
Online Access:https://lim.bntu.by/jour/article/view/699