Modeling and Scheduling Two-stage Assembly Flow Shop Problems with Non-Identical Assembly Machines

The purpose of this research is to deal with the problem of two-stage assembly flow shop scheduling. A number of single-item products (identical) each formed of several different parts are ordered. Each part has m operations done at the first  stage with m different machines. After manufact...

Full description

Bibliographic Details
Main Authors: m. bashi varshosaz, b. naderi, m. mohammadi
Format: Article
Language:fas
Published: Isfahan University of Technology 2018-09-01
Series:Ravish/hā-yi ̒adadī dar Muhandisī
Subjects:
Online Access:http://jcme.iut.ac.ir/browse.php?a_code=A-10-457-1&slc_lang=en&sid=1