Modeling and Scheduling Two-stage Assembly Flow Shop Problems with Non-Identical Assembly Machines
The purpose of this research is to deal with the problem of two-stage assembly flow shop scheduling. A number of single-item products (identical) each formed of several different parts are ordered. Each part has m operations done at the first stage with m different machines. After manufact...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | fas |
Published: |
Isfahan University of Technology
2018-09-01
|
Series: | Ravish/hā-yi ̒adadī dar Muhandisī |
Subjects: | |
Online Access: | http://jcme.iut.ac.ir/browse.php?a_code=A-10-457-1&slc_lang=en&sid=1 |