Sedimentary-vegetation response to the channel by-pass: A case study of the Danube river
The Gabčíkovo-Nagymaros waterworks construction on Danube river in Slovakia (1977−1992) was followed with major ecological consequences. The water level and flow velocity was decreased in the original by-passed channel in order to keep high water level for shipping in the bypass canal. The decrease...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2017-06-01
|
Series: | Ekológia (Bratislava) |
Subjects: | |
Online Access: | https://doi.org/10.1515/eko-2017-0015 |