Scheduling construction projects with resources accessibility limited and changeable in time

This paper aims at solving the problem of minimising the construction project duration in deterministic conditions when the accessibility of renewable resources is limited and changeable in time (workforce, machines and equipment). Particular construction processes (with various levels of complexit...

Full description

Bibliographic Details
Main Authors: Piotr Jaśkowski, Anna Sobotka
Format: Article
Language:English
Published: Vilnius Gediminas Technical University 2004-12-01
Series:Journal of Civil Engineering and Management
Subjects:
Online Access:http://localhost/journals.vgtu.lt/index.php/JCEM/article/view/8995
id doaj-c6e19d8b47ff447c8762f5b03ba7eebe
record_format Article
spelling doaj-c6e19d8b47ff447c8762f5b03ba7eebe2021-07-02T06:56:25ZengVilnius Gediminas Technical UniversityJournal of Civil Engineering and Management1392-37301822-36052004-12-0110410.3846/13923730.2004.9636319Scheduling construction projects with resources accessibility limited and changeable in timePiotr Jaśkowski0Anna Sobotka1Doctor Eng, Faculty of Civil and Sanitary Engineering , Lublin University of Technology , ul. Nadbystrzycka 40, Lublin, 20–618, PolandAssoc Prof, Faculty of Civil and Sanitary Engineering , Lublin University of Technology , ul. Nadbystrzycka 40, Lublin, 20–618, Poland This paper aims at solving the problem of minimising the construction project duration in deterministic conditions when the accessibility of renewable resources is limited and changeable in time (workforce, machines and equipment). Particular construction processes (with various levels of complexity) must be conducted in the established technological order and can be executed in different technological and organisational variants (different contractors, technologies, and ways of using resources). To solve this problem the authors are using evolutionary algorithm. For the assessment of solutions generated by evolutionary algorithm, the authors have worked out a heuristic algorithm (of resources allocation and project duration calculation). This methodology seems to produce similar outcomes when juxtaposed with other solutions obtained by research works carried out using comparable methodologies. The paper contains an example of practical application of evolutionary algorithm for construction project planning within resources and time constraints. First Published Online: 14 Oct 2010 http://localhost/journals.vgtu.lt/index.php/JCEM/article/view/8995project schedulingtime and resources constraintsevolutionary algorithmmetaheuristic methodssuboptimal solutionminimising project duration
collection DOAJ
language English
format Article
sources DOAJ
author Piotr Jaśkowski
Anna Sobotka
spellingShingle Piotr Jaśkowski
Anna Sobotka
Scheduling construction projects with resources accessibility limited and changeable in time
Journal of Civil Engineering and Management
project scheduling
time and resources constraints
evolutionary algorithm
metaheuristic methods
suboptimal solution
minimising project duration
author_facet Piotr Jaśkowski
Anna Sobotka
author_sort Piotr Jaśkowski
title Scheduling construction projects with resources accessibility limited and changeable in time
title_short Scheduling construction projects with resources accessibility limited and changeable in time
title_full Scheduling construction projects with resources accessibility limited and changeable in time
title_fullStr Scheduling construction projects with resources accessibility limited and changeable in time
title_full_unstemmed Scheduling construction projects with resources accessibility limited and changeable in time
title_sort scheduling construction projects with resources accessibility limited and changeable in time
publisher Vilnius Gediminas Technical University
series Journal of Civil Engineering and Management
issn 1392-3730
1822-3605
publishDate 2004-12-01
description This paper aims at solving the problem of minimising the construction project duration in deterministic conditions when the accessibility of renewable resources is limited and changeable in time (workforce, machines and equipment). Particular construction processes (with various levels of complexity) must be conducted in the established technological order and can be executed in different technological and organisational variants (different contractors, technologies, and ways of using resources). To solve this problem the authors are using evolutionary algorithm. For the assessment of solutions generated by evolutionary algorithm, the authors have worked out a heuristic algorithm (of resources allocation and project duration calculation). This methodology seems to produce similar outcomes when juxtaposed with other solutions obtained by research works carried out using comparable methodologies. The paper contains an example of practical application of evolutionary algorithm for construction project planning within resources and time constraints. First Published Online: 14 Oct 2010
topic project scheduling
time and resources constraints
evolutionary algorithm
metaheuristic methods
suboptimal solution
minimising project duration
url http://localhost/journals.vgtu.lt/index.php/JCEM/article/view/8995
work_keys_str_mv AT piotrjaakowski schedulingconstructionprojectswithresourcesaccessibilitylimitedandchangeableintime
AT annasobotka schedulingconstructionprojectswithresourcesaccessibilitylimitedandchangeableintime
_version_ 1721336625801199616