Implementation of a Load Prediction Program System for the Norwegian Power Pool
A model for short-term load prediction (24 hours) has been developed. It is implemented as a part of an interactive program system for load prediction within the different areas of the Norwegian Power Pool. The model consists of two parts, describing the slow, seasonal variations (normal conditions)...
Main Authors: | Sverre Aam, Øyvin Skarstein, L. Gagnat |
---|---|
Format: | Article |
Language: | English |
Published: |
Norwegian Society of Automatic Control
1982-07-01
|
Series: | Modeling, Identification and Control |
Subjects: | |
Online Access: | http://www.mic-journal.no/PDF/1982/MIC-1982-3-2.pdf |
Similar Items
-
Condition monitoring of power plants using extended Kalman filtering
by: Øyvin Skarstein
Published: (1988-07-01) -
An Implementation of Estimation Techniques to a Hydrological Model for Prediction of Runoff to a Hydroelectric Power-Station
by: Magne Fjeld, et al.
Published: (1981-01-01) -
Tsunami Prediction and Earthquake Parameters Estimation in the Red Sea
by: Sawlan, Zaid A
Published: (2012) - Online Parameter Learning for Structural Condition Monitoring System
-
Online parameter estimation applied to mixed conduction/radiation
by: Shah, Tejas Jagdish
Published: (2005)