Implementation of a Load Prediction Program System for the Norwegian Power Pool

A model for short-term load prediction (24 hours) has been developed. It is implemented as a part of an interactive program system for load prediction within the different areas of the Norwegian Power Pool. The model consists of two parts, describing the slow, seasonal variations (normal conditions)...

Full description

Bibliographic Details
Main Authors: Sverre Aam, Øyvin Skarstein, L. Gagnat
Format: Article
Language:English
Published: Norwegian Society of Automatic Control 1982-07-01
Series:Modeling, Identification and Control
Subjects:
Online Access:http://www.mic-journal.no/PDF/1982/MIC-1982-3-2.pdf