Optimization Model for the Short-Term Operation of Hydropower Plants Transmitting Power to Multiple Power Grids via HVDC Transmission Lines
Long-distance and large-capacity hydropower transmission from large hydropower plants in southwestern China to load centers is an important and effective measure for the accommodation of large-scale hydropower in China. However, the load demands of the receiving-end power grids are not fully conside...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2019-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8848384/ |