Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM
The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tunneling mileage is 569 km, which includes 49 slow-inclined shafts and vertical shafts. Among the t...
Main Author: | Mingjiang Deng |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2018-02-01
|
Series: | Engineering |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2095809918300419 |
Similar Items
-
TBM Tunnelling at the Stillwater Mine
by: Eide, Leon Nikolay Røren
Published: (2014) -
Interaction between groundwater and TBM (Tunnel Boring Machine) excavated tunnels
by: Font Capó, Jordi
Published: (2012) -
Anti Abrasive Additives for Hard Rock TBM Tunnelling
by: Valestrand, Anders J, et al.
Published: (2013) -
Estimation of soft ground tool life in TBM tunnelling
by: Jakobsen, Pål Drevland
Published: (2014) -
Techno - economic analysis for the construction of the supply tunnel of hpp "Dabar" with the application of TBM technology
by: Mirković Uroš B.
Published: (2019-01-01)