Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM
The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tunneling mileage is 569 km, which includes 49 slow-inclined shafts and vertical shafts. Among the t...