Construction work cost and duration analysis with the use of agent-based modelling and simulation
Assuming a systemic approach, a construction project can be treated as a complex system composed of many different interlinked elements such as construction works, human agents, equipment, materials and the knowledge needed to perform the said work. The system’s structure can be divided into many mu...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
De Gruyter
2021-07-01
|
Series: | Open Engineering |
Subjects: | |
Online Access: | https://doi.org/10.1515/eng-2021-0081 |