A Real-Time Load Distribution Method of Hydro-Thermal Power Grid Based on Working Conditions Self-Matching

Short-term hydro-thermal power optimal dispatch is a classical problem. Traditional scheduling methods cannot meet the requirements of different dispatch periods separately, and can hardly ensure the safety operation of cascade hydropower stations and reduce wasting water. So the problem how to ensu...

Full description

Bibliographic Details
Main Authors: Chen Fang, Zhou Jianzhong, Wang Xuemin
Format: Article
Language:English
Published: EDP Sciences 2016-01-01
Series:MATEC Web of Conferences
Online Access:http://dx.doi.org/10.1051/matecconf/20165506005