Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling
The project portfolio scheduling problem as a multiple criteria decision making problem and a three step procedure to solve this problem have been presnted. In the first step, the problem was described by a multiple criteria mathematical model. Three criteria have been considered: minimization of th...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Wrocław University of Science and Technology
2013-01-01
|
Series: | Operations Research and Decisions |
Online Access: | http://orduser.pwr.wroc.pl/DownloadFile.aspx?aid=1064 |
id |
doaj-bf234b0c084d4f7a8cd47e68e4087ce4 |
---|---|
record_format |
Article |
spelling |
doaj-bf234b0c084d4f7a8cd47e68e4087ce42020-11-24T20:41:28ZengWrocław University of Science and TechnologyOperations Research and Decisions2081-88582391-60602013-01-01vol. 23no. 45574171283009Three Step Procedure for a Multiple Criteria Problem of Project Portfolio SchedulingBogumiła Krzeszowska0University of Economics in Katowice, PolandThe project portfolio scheduling problem as a multiple criteria decision making problem and a three step procedure to solve this problem have been presnted. In the first step, the problem was described by a multiple criteria mathematical model. Three criteria have been considered: minimization of the sum of penalties for projects delays, minimization of resource overuse and NPV maximization. In the second step, non-dominated solutions were identified by using an elitist evolutionary algorithm for multiple optimization. In the third step, an interactive procedure has been applied to choose the final solution. An example of a portfolio of IT projects was used for computations. (original abstract)http://orduser.pwr.wroc.pl/DownloadFile.aspx?aid=1064 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Bogumiła Krzeszowska |
spellingShingle |
Bogumiła Krzeszowska Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling Operations Research and Decisions |
author_facet |
Bogumiła Krzeszowska |
author_sort |
Bogumiła Krzeszowska |
title |
Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling |
title_short |
Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling |
title_full |
Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling |
title_fullStr |
Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling |
title_full_unstemmed |
Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling |
title_sort |
three step procedure for a multiple criteria problem of project portfolio scheduling |
publisher |
Wrocław University of Science and Technology |
series |
Operations Research and Decisions |
issn |
2081-8858 2391-6060 |
publishDate |
2013-01-01 |
description |
The project portfolio scheduling problem as a multiple criteria decision making problem and a three step procedure to solve this problem have been presnted. In the first step, the problem was described by a multiple criteria mathematical model. Three criteria have been considered: minimization of the sum of penalties for projects delays, minimization of resource overuse and NPV maximization. In the second step, non-dominated solutions were identified by using an elitist evolutionary algorithm for multiple optimization. In the third step, an interactive procedure has been applied to choose the final solution. An example of a portfolio of IT projects was used for computations. (original abstract) |
url |
http://orduser.pwr.wroc.pl/DownloadFile.aspx?aid=1064 |
work_keys_str_mv |
AT bogumiłakrzeszowska threestepprocedureforamultiplecriteriaproblemofprojectportfolioscheduling |
_version_ |
1716825014378954752 |