Three Step Procedure for a Multiple Criteria Problem of Project Portfolio Scheduling
The project portfolio scheduling problem as a multiple criteria decision making problem and a three step procedure to solve this problem have been presnted. In the first step, the problem was described by a multiple criteria mathematical model. Three criteria have been considered: minimization of th...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Wrocław University of Science and Technology
2013-01-01
|
Series: | Operations Research and Decisions |
Online Access: | http://orduser.pwr.wroc.pl/DownloadFile.aspx?aid=1064 |