A Mathematical Model of Intermittent Gas Lift in Elevation-Production Operation with Line-Pack and Line-Drafting Phenomena in a Gas Line

This paper discusses a transient model of the intermittent gas lift technique in an oil well. The model is developed in the gas line, in the tubing-casing annulus, and the tubing. The line-pack and line-drafting phenomena in the gas line are considered in the model. A numerical approach will be used...

Full description

Bibliographic Details
Main Authors: Silvya Dewi Rahmawati, Tasmi Tasmi, Pudjo Sukarno, Agus Yodi Gunawan, Edy Soewono, Septoratno Siregar, Edward L. Tobing
Format: Article
Language:English
Published: Universitas Islam Riau (UIR) Press 2020-10-01
Series:Journal of Earth Energy Engineering
Subjects:
Online Access:https://journal.uir.ac.id/index.php/JEEE/article/view/5264