A method to calculate reasonable water injection rate for M oilfield

Abstract In recent years, M oilfield has entered into high water cut stage. Two main problems are imposed in the process of development including sharp water cut rising rate and rapid oil production decline. These problems are difficult to solve, which may bring other problems. In order to slow down...

Full description

Bibliographic Details
Main Authors: Kaichun Yu, Kuang Li, Qianru Li, Keman Li, Feng Yang
Format: Article
Language:English
Published: SpringerOpen 2017-05-01
Series:Journal of Petroleum Exploration and Production Technology
Subjects:
Online Access:http://link.springer.com/article/10.1007/s13202-017-0356-9
id doaj-bd2dd365c315406682bd56c9d93d3f81
record_format Article
spelling doaj-bd2dd365c315406682bd56c9d93d3f812020-11-25T00:49:16ZengSpringerOpenJournal of Petroleum Exploration and Production Technology2190-05582190-05662017-05-01741003101010.1007/s13202-017-0356-9A method to calculate reasonable water injection rate for M oilfieldKaichun Yu0Kuang Li1Qianru Li2Keman Li3Feng Yang4Department of Earth Sciences, Zhejiang UniversityCollege of Petroleum Engineering, Northeast Petroleum UniversityCollege of Petroleum Engineering, Northeast Petroleum UniversityCollege of Petroleum Engineering, Northeast Petroleum UniversityCollege of Petroleum Engineering, Northeast Petroleum UniversityAbstract In recent years, M oilfield has entered into high water cut stage. Two main problems are imposed in the process of development including sharp water cut rising rate and rapid oil production decline. These problems are difficult to solve, which may bring other problems. In order to slow down production decline rate and control the rising rate of water cut, it is necessary to control water injection rate. However, oil production rate can be affected if water injection rate is too low to provide enough water volume for maintaining reservoir pressure. A method to calculate reasonable injection–production ratio and predict water cut is provided in this paper. Its main mechanism is to resolve above contradictions by calculating reasonable water injection rate. Firstly, an equation to calculate reasonable injection–production ratio is deduced by material balance equation. It considers several parameters including rate of pressure recovery, water cut and other production indexes. Secondly, reasonable oil production rates and water cut of future 10 years are predicted. Oil production is predicted by the law of production decline, and water cut is predicted by regression equation of water drive characteristic curve. Lastly, reasonable water injection rates of next 10 years are calculated through predicted injection–production ratios and liquid production rates. Taking M oilfield as an example, this paper presents a method to determine reasonable water injection rate of multilayer sandstone water drive reservoir.http://link.springer.com/article/10.1007/s13202-017-0356-9Reasonable water injection rateReasonable reservoir pressureMaterial balance equationAnticline multilayer sandstone water drive reservoir
collection DOAJ
language English
format Article
sources DOAJ
author Kaichun Yu
Kuang Li
Qianru Li
Keman Li
Feng Yang
spellingShingle Kaichun Yu
Kuang Li
Qianru Li
Keman Li
Feng Yang
A method to calculate reasonable water injection rate for M oilfield
Journal of Petroleum Exploration and Production Technology
Reasonable water injection rate
Reasonable reservoir pressure
Material balance equation
Anticline multilayer sandstone water drive reservoir
author_facet Kaichun Yu
Kuang Li
Qianru Li
Keman Li
Feng Yang
author_sort Kaichun Yu
title A method to calculate reasonable water injection rate for M oilfield
title_short A method to calculate reasonable water injection rate for M oilfield
title_full A method to calculate reasonable water injection rate for M oilfield
title_fullStr A method to calculate reasonable water injection rate for M oilfield
title_full_unstemmed A method to calculate reasonable water injection rate for M oilfield
title_sort method to calculate reasonable water injection rate for m oilfield
publisher SpringerOpen
series Journal of Petroleum Exploration and Production Technology
issn 2190-0558
2190-0566
publishDate 2017-05-01
description Abstract In recent years, M oilfield has entered into high water cut stage. Two main problems are imposed in the process of development including sharp water cut rising rate and rapid oil production decline. These problems are difficult to solve, which may bring other problems. In order to slow down production decline rate and control the rising rate of water cut, it is necessary to control water injection rate. However, oil production rate can be affected if water injection rate is too low to provide enough water volume for maintaining reservoir pressure. A method to calculate reasonable injection–production ratio and predict water cut is provided in this paper. Its main mechanism is to resolve above contradictions by calculating reasonable water injection rate. Firstly, an equation to calculate reasonable injection–production ratio is deduced by material balance equation. It considers several parameters including rate of pressure recovery, water cut and other production indexes. Secondly, reasonable oil production rates and water cut of future 10 years are predicted. Oil production is predicted by the law of production decline, and water cut is predicted by regression equation of water drive characteristic curve. Lastly, reasonable water injection rates of next 10 years are calculated through predicted injection–production ratios and liquid production rates. Taking M oilfield as an example, this paper presents a method to determine reasonable water injection rate of multilayer sandstone water drive reservoir.
topic Reasonable water injection rate
Reasonable reservoir pressure
Material balance equation
Anticline multilayer sandstone water drive reservoir
url http://link.springer.com/article/10.1007/s13202-017-0356-9
work_keys_str_mv AT kaichunyu amethodtocalculatereasonablewaterinjectionrateformoilfield
AT kuangli amethodtocalculatereasonablewaterinjectionrateformoilfield
AT qianruli amethodtocalculatereasonablewaterinjectionrateformoilfield
AT kemanli amethodtocalculatereasonablewaterinjectionrateformoilfield
AT fengyang amethodtocalculatereasonablewaterinjectionrateformoilfield
AT kaichunyu methodtocalculatereasonablewaterinjectionrateformoilfield
AT kuangli methodtocalculatereasonablewaterinjectionrateformoilfield
AT qianruli methodtocalculatereasonablewaterinjectionrateformoilfield
AT kemanli methodtocalculatereasonablewaterinjectionrateformoilfield
AT fengyang methodtocalculatereasonablewaterinjectionrateformoilfield
_version_ 1725251965905010688