A method to calculate reasonable water injection rate for M oilfield
Abstract In recent years, M oilfield has entered into high water cut stage. Two main problems are imposed in the process of development including sharp water cut rising rate and rapid oil production decline. These problems are difficult to solve, which may bring other problems. In order to slow down...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
SpringerOpen
2017-05-01
|
Series: | Journal of Petroleum Exploration and Production Technology |
Subjects: | |
Online Access: | http://link.springer.com/article/10.1007/s13202-017-0356-9 |