A Study on Optimization of CBM Water Drainage by Well-Test Deconvolution in the Early Development Stage
Different from the conventional gas reservoir, coalbed methane is developed mainly by water drainage, which leads methane desorption after reservoir pressure drop. Water drainage at a reasonable speed in the early development stage is the key for enhancing later gas performance. Therefore, the inves...
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-07-01
|
Series: | Water |
Subjects: | |
Online Access: | http://www.mdpi.com/2073-4441/10/7/929 |