STRESS ANALYSIS AND TOPOLOGY OPTIMIZATION OF A CHAIN BUCKET ELEVATOR USING ANSYS

A failure of conveyor chain links in a production process can cause unscheduled shutdowns, which increase the throughput time coupled with damaged buckets and chain links, which increase maintenance and repair costs. Since failures of conveyor chains are inevitable, this research aims to modify the...

Full description

Bibliographic Details
Main Authors: Edward Yin, Emmanuel M. Seckley, Evans Kesse Asiedu, Stephen Cobbinah
Format: Article
Language:English
Published: CTU Central Library 2021-03-01
Series:Acta Polytechnica
Subjects:
Online Access:https://ojs.cvut.cz/ojs/index.php/ap/article/view/6624