A study of the mechanical structure of the direct roof during the whole process of non-pillar gob-side entry retaining by roof cutting
The non-pillar entry (roadway) retained by roof cutting serves the two adjacent working faces. As compared with the conventional mining roadways, the roadway retained by roof cutting has a longer life cycle and receives more complicated influence from mining. Determining the location where the roof...